Schedule 40 304 Stainless Steel Pipe
The dimensions of a Schedule 40 304 stainless steel pipe can vary depending on the nominal pipe size (NPS) and the specific manufacturer. Here are some common dimensions for Schedule 40 304 stainless steel pipe:
- NPS 1/8" to 12": The outer diameter (OD) ranges from 0.405 inches to 12.75 inches, and the wall thickness (WT) ranges from 0.068 inches to 0.906 inches.
- NPS 14" to 24": The OD ranges from 14 inches to 24 inches, and the WT ranges from 0.375 inches to 1.000 inches.
- NPS 26" and larger: The OD and WT can vary significantly, and specific dimensions should be obtained from the manufacturer.
It is important to note that these dimensions are approximate and may vary slightly depending on the specific manufacturer and production standards. It is recommended to consult the manufacturer's specifications or a piping engineering reference for precise dimensions.
Product Type |
Stainless Steel Pipe/Tube |
Grade |
200 Series: 201,202 |
Surface Finish |
2B, BA, NO.1, NO.4, 8K, HL, Embossing, Satin, Mirror, ect |
Standard |
JIS/SUS/GB/DIN/ASTM/AISI/EN |
Technique |
Cold Drawn, Cold Rolled, Hot Rolled. |
Outer Diameter |
6-2500mm(as required) |
Thickness |
0.3-4mm cold rolled; 3-100mm hot rolled; Customized |
Length |
2000mm, 2438mm, 2500mm, 3000mm, 6000mm or as required |
Certifications |
ISO 9001 BV SGS |
Application |
Decoration; Architectur; Kitchen; Shipbuilding;Boiler Gas;Chemical Industry;Petroleum Engineering;Power Plant |
Delivery Time |
Fast delievery in 7 days,up to order quantity |
Payment Terms |
30% TT for deposit,70% TT /70% LC at sight balance before shipment |
Price Terms |
FOB, EXW, CIF, CFR |
Packing |
Standard Sea Worthy Package or according to customer's requirements |
Produceing Process
1. Raw Material Selection: The first step is to select the appropriate raw material, which in this case is 304 stainless steel. This type of stainless steel is known for its corrosion resistance and high strength.
2. Cutting: The selected stainless steel is then cut into the desired length for the pipe. This can be done using various methods such as sawing or shearing.
3. Forming: The cut stainless steel is then formed into the shape of a pipe. This can be done using a variety of methods, including rolling, bending, or extrusion.
4. Welding: The formed stainless steel pipe is then welded together to create a continuous pipe. This can be done using various welding techniques such as TIG (Tungsten Inert Gas) welding or MIG (Metal Inert Gas) welding.
5. Heat Treatment: After welding, the stainless steel pipe may undergo a heat treatment process to improve its mechanical properties. This can involve processes such as annealing or solution heat treatment.
6. Surface Treatment: The pipe may undergo surface treatment processes to improve its appearance and corrosion resistance. This can include processes such as pickling, passivation, or polishing.
7. Inspection and Testing: The finished stainless steel pipe is then inspected and tested for quality assurance. This can involve various tests such as dimensional inspection, visual inspection, and non-destructive testing methods like ultrasonic testing or radiographic testing.
8. Packaging and Shipping: Once the stainless steel pipe passes all quality checks, it is then packaged and prepared for shipping to the customer. This typically involves protecting the pipe from damage during transportation and ensuring it is properly labeled for identification.